All jurisdictions
Wyoming OS/OW Permit Requirements
United States ยท WYDOT โ Motor Carrier Services, Permit Section
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Wyoming: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$20 single-trip + mileage
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 14' โ oversize permit required (Wyoming legal limit 14')
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 75' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 20' โ route survey required
- HeightHeight exceeds 17' โ route survey required
- WeightGross weight exceeds 250,000 lbs โ WYDOT special superload permit required
Fee notes
Single-trip $20 base + $0.04โ$0.15/mile overweight. Annual $60. Superload (>14 ft H/W) requires WYDOT engineering review at $250+.
Official resources
- Official permit portal
- Official fee schedule
- WYDOT Commercial Permits
- Wyoming OS/OW Regulations
- Wyoming Permit Application
Reference information last verified May 2026. Always confirm current requirements with WYDOT โ Motor Carrier Services, Permit Section.
Surveying a route through Wyoming?
RoadScope generates Wyoming-compliant survey reports automatically โ the right sections, certifications and documentation for WYDOT โ Motor Carrier Services, Permit Section.
Try RoadScope Free