Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

District of Columbia OS/OW Permit Requirements

United States ยท DDOT โ€” Infrastructure Project Management Administration, OS/OW Permits

Everything heavy-haul carriers need to know before moving an oversize or overweight load through District of Columbia: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
$25 single-trip OS/OW permit
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 55' โ€” oversize permit required (DC limit 55')
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 12' โ€” DDOT route approval required
  • Height
    Height exceeds 14' โ€” DDOT route survey required

Fee notes

Flat $25 per single-trip permit. DC requires MPD escort on most superloads โ€” billed at MPD overtime rate (~$95/hr, 4-hour minimum).

Official resources

Reference information last verified May 2026. Always confirm current requirements with DDOT โ€” Infrastructure Project Management Administration, OS/OW Permits.

Surveying a route through District of Columbia?

RoadScope generates District of Columbia-compliant survey reports automatically โ€” the right sections, certifications and documentation for DDOT โ€” Infrastructure Project Management Administration, OS/OW Permits.

Try RoadScope Free