Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Arkansas OS/OW Permit Requirements

United States ยท ARDOT โ€” Motor Carrier Services, Permit Section

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Arkansas: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$17 single-trip OS/OW permit
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” escort and route survey required
  • Height
    Height exceeds 15' โ€” route survey required

Fee notes

Flat $17 per single-trip permit; annual permits $50โ€“$200 by class. Superload route surveys billed separately ($500+ depending on study scope).

Official resources

Reference information last verified May 2026. Always confirm current requirements with ARDOT โ€” Motor Carrier Services, Permit Section.

Surveying a route through Arkansas?

RoadScope generates Arkansas-compliant survey reports automatically โ€” the right sections, certifications and documentation for ARDOT โ€” Motor Carrier Services, Permit Section.

Try RoadScope Free