Alaska OS/OW Permit Requirements
United States ยท ADOT&PF โ Commercial Vehicle Services
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Alaska: survey triggers, fees, lead times and the official permit portal.
Lead time
5 business days
Base fee
$30 single-trip; $400 annual
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 14' โ oversize permit required (Alaska legal limit 14')
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 75' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 18' โ route survey and pilot car required
- WeightGross weight exceeds 200,000 lbs โ engineering analysis required
Fee notes
Single-trip $30 base; annual $400. Pilot car requirements add $1.50โ$2.50/mile per escort. No superload surcharge โ engineering review billed at cost.
Official resources
- Official permit portal
- Official fee schedule
- ADOT&PF Commercial Vehicle Services โ Permits
- Alaska OS/OW Permit Manual
- Alaska OS/OW Application Forms
Reference information last verified May 2026. Always confirm current requirements with ADOT&PF โ Commercial Vehicle Services.