Arizona OS/OW Permit Requirements
United States ยท ADOT โ Motor Vehicle Division, Commercial Permits
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Arizona: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$15 single-trip + mileage
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 16' โ route survey required
- HeightHeight exceeds 15' โ route survey required
Fee notes
Single-trip $15 plus $0.06/mile for overweight. Annual permits from $360. Superloads (>14 ft wide, >250,000 lbs) require engineering review at ~$500โ$2,000.
Official resources
- Official permit portal
- Official fee schedule
- ADOT Commercial Truck & Bus Permits
- Arizona OS/OW Permit Manual
- Arizona Permit Application
- Arizona OS/OW FAQ
Reference information last verified May 2026. Always confirm current requirements with ADOT โ Motor Vehicle Division, Commercial Permits.