West Virginia OS/OW Permit Requirements

United States ยท WVDOT โ€” Motor Carrier Division, Permit Office

Everything heavy-haul carriers need to know before moving an oversize or overweight load through West Virginia: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$20 single-trip; $200 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 14' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required

Fee notes

Single-trip $20 base. Annual $200. Coal/heavy-haul overweight tiers add $20โ€“$500. Superload requires WVDOH bridge analysis at $300+.

Official resources

Reference information last verified May 2026. Always confirm current requirements with WVDOT โ€” Motor Carrier Division, Permit Office.