All jurisdictions
Vermont OS/OW Permit Requirements
United States ยท VTrans โ Motor Carrier Division, Permit Office
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Vermont: survey triggers, fees, lead times and the official permit portal.
Lead time
5 business days
Base fee
$25 single-trip; $200 annual
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 14' โ route survey required
- HeightHeight exceeds 14' โ route survey required
Fee notes
Single-trip $25 base. Annual $200. Bridge restrictions (Vermont has many posted bridges) trigger VTrans engineering review at $250+.
Official resources
- Official permit portal
- Official fee schedule
- VTrans Permits
- Vermont OS/OW Regulations
- Vermont Permit Application
Reference information last verified May 2026. Always confirm current requirements with VTrans โ Motor Carrier Division, Permit Office.
Surveying a route through Vermont?
RoadScope generates Vermont-compliant survey reports automatically โ the right sections, certifications and documentation for VTrans โ Motor Carrier Division, Permit Office.
Try RoadScope Free