All jurisdictions
South Dakota OS/OW Permit Requirements
United States ยท SDDOT โ Motor Carrier Services, Permit Section
Everything heavy-haul carriers need to know before moving an oversize or overweight load through South Dakota: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$20 single-trip + mileage
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 18' โ route survey required
- HeightHeight exceeds 15' โ route survey required
- WeightGross weight exceeds 200,000 lbs โ SDDOT special haul permit required
Fee notes
Single-trip $20 base + $0.04โ$0.10/mile overweight. Annual $90. Superload engineering review at SDDOT cost.
Official resources
- Official permit portal
- Official fee schedule
- SD Truck Info Permit System
- South Dakota OS/OW Regulations
- South Dakota Permit Application
Reference information last verified May 2026. Always confirm current requirements with SDDOT โ Motor Carrier Services, Permit Section.
Surveying a route through South Dakota?
RoadScope generates South Dakota-compliant survey reports automatically โ the right sections, certifications and documentation for SDDOT โ Motor Carrier Services, Permit Section.
Try RoadScope Free