Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

South Carolina OS/OW Permit Requirements

United States ยท SCDOT โ€” Motor Carrier Division, OS/OW Permits

Everything heavy-haul carriers need to know before moving an oversize or overweight load through South Carolina: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$30 single-trip; $300 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required

Fee notes

Single-trip $30 base. Annual $300. Overweight $10โ€“$200 by tier. Superload (>16 ft wide, >150,000 lbs) requires SCDOT bridge review at $300+.

Official resources

Reference information last verified May 2026. Always confirm current requirements with SCDOT โ€” Motor Carrier Division, OS/OW Permits.

Surveying a route through South Carolina?

RoadScope generates South Carolina-compliant survey reports automatically โ€” the right sections, certifications and documentation for SCDOT โ€” Motor Carrier Division, OS/OW Permits.

Try RoadScope Free