All jurisdictions
Rhode Island OS/OW Permit Requirements
United States ยท RIDOT โ Division of Planning & Programming, Special Hauling Permits
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Rhode Island: survey triggers, fees, lead times and the official permit portal.
Lead time
5 business days
Base fee
$20 single-trip OS/OW permit
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 14' โ route survey required
- HeightHeight exceeds 14' โ route survey required
Fee notes
Single-trip $20 base. Annual $80. Superload engineering review billed at RIDOT hourly rate.
Official resources
- Official permit portal
- Official fee schedule
- RIDOT Truck Restrictions & Permits
- Rhode Island OS/OW Regulations
- Rhode Island Permit Application
Reference information last verified May 2026. Always confirm current requirements with RIDOT โ Division of Planning & Programming, Special Hauling Permits.
Surveying a route through Rhode Island?
RoadScope generates Rhode Island-compliant survey reports automatically โ the right sections, certifications and documentation for RIDOT โ Division of Planning & Programming, Special Hauling Permits.
Try RoadScope Free