Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Oregon OS/OW Permit Requirements

United States ยท ODOT โ€” Motor Carrier Transportation Division (MCTD)

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Oregon: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$8 single-trip + mileage
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 14' โ€” oversize permit required (Oregon legal limit 14')
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 75' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” route survey required
  • Height
    Height exceeds 16' โ€” route survey required
  • Weight
    Gross weight exceeds 250,000 lbs โ€” Oregon superload permit required

Fee notes

Single-trip $8 base + $0.05โ€“$0.30/mile by axle weight. Annual $90 base. Superload (>14 ft H/W) requires ODOT route survey at $500+.

Official resources

Reference information last verified May 2026. Always confirm current requirements with ODOT โ€” Motor Carrier Transportation Division (MCTD).

Surveying a route through Oregon?

RoadScope generates Oregon-compliant survey reports automatically โ€” the right sections, certifications and documentation for ODOT โ€” Motor Carrier Transportation Division (MCTD).

Try RoadScope Free