All jurisdictions
Oklahoma OS/OW Permit Requirements
United States ยท ODOT โ Motor Carrier Division, Permit Section
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Oklahoma: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$40 single-trip; $300 annual
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 16' โ route survey required
- HeightHeight exceeds 15' โ route survey required
- WeightGross weight exceeds 200,000 lbs โ ODOT superload engineering review
Fee notes
Single-trip $40 base. Annual $300. Overweight surcharge $20โ$300 by tier. Superload (>16 ft wide, >180,000 lbs) requires ODOT engineering review at $500+.
Official resources
- Official permit portal
- Official fee schedule
- ODOT Size & Weight Permits
- Oklahoma OS/OW Regulations
- Oklahoma Permit Application
Reference information last verified May 2026. Always confirm current requirements with ODOT โ Motor Carrier Division, Permit Section.
Surveying a route through Oklahoma?
RoadScope generates Oklahoma-compliant survey reports automatically โ the right sections, certifications and documentation for ODOT โ Motor Carrier Division, Permit Section.
Try RoadScope Free