Ohio OS/OW Permit Requirements

United States ยท ODOT โ€” Motor Carrier Services, Permit Office

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Ohio: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$50 single-trip; $500 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required
  • Weight
    Gross weight exceeds 200,000 lbs โ€” ODOT special superload permit required

Fee notes

Single-trip $50 base. Annual $500. Overweight $25โ€“$1,000 by class. Superload (>14 ft H, >200,000 lbs GVW) requires ODOT bridge analysis at $500โ€“$2,500.

Official resources

Reference information last verified May 2026. Always confirm current requirements with ODOT โ€” Motor Carrier Services, Permit Office.