New York OS/OW Permit Requirements

United States ยท NYSDOT โ€” Office of Freight & Commercial Vehicle Operations

Everything heavy-haul carriers need to know before moving an oversize or overweight load through New York: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
$40 single-trip + mileage; $360 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” single-trip permit required
  • Width
    Width exceeds 8'6" โ€” single-trip permit required
  • Length
    Length exceeds 65' โ€” single-trip permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Height
    Height exceeds 14' โ€” route survey mandatory
  • Width
    Width exceeds 14' โ€” escort and route survey required

Fee notes

Single-trip $40 base + $0.05โ€“$0.30/mile overweight surcharge (17 NYCRR Part 154, by excess weight). Annual divisible-load permit $360. Superload (>14 ft H, >16 ft W, >200,000 lbs) requires NYSDOT structural review at $500โ€“$3,000.

Official resources

Reference information last verified May 2026. Always confirm current requirements with NYSDOT โ€” Office of Freight & Commercial Vehicle Operations.