All jurisdictions
New Hampshire OS/OW Permit Requirements
United States ยท NHDOT โ Bureau of Traffic, Oversize/Overweight Permits
Everything heavy-haul carriers need to know before moving an oversize or overweight load through New Hampshire: survey triggers, fees, lead times and the official permit portal.
Lead time
5 business days
Base fee
$25 single-trip OS/OW permit
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 14' โ route survey required
- HeightHeight exceeds 14' โ route survey required
Fee notes
Single-trip $25 base. Annual $200. Bridge restrictions trigger NHDOT engineering review at $150โ$1,000 per analysis.
Official resources
- Official permit portal
- Official fee schedule
- NHDOT Permits
- NH OS/OW Regulations
- NH Permit Application
Reference information last verified May 2026. Always confirm current requirements with NHDOT โ Bureau of Traffic, Oversize/Overweight Permits.
Surveying a route through New Hampshire?
RoadScope generates New Hampshire-compliant survey reports automatically โ the right sections, certifications and documentation for NHDOT โ Bureau of Traffic, Oversize/Overweight Permits.
Try RoadScope Free