Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Nebraska OS/OW Permit Requirements

United States ยท NDOR โ€” Motor Carrier Services, Permit Section

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Nebraska: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$25 single-trip; $400 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 18' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required
  • Weight
    Gross weight exceeds 200,000 lbs โ€” special superload permit required

Fee notes

Single-trip $25 base. Annual $400. Overweight $15โ€“$250 by class. Superload (>16 ft wide, >150,000 lbs) requires NDOT bridge review at $250โ€“$1,500.

Official resources

Reference information last verified May 2026. Always confirm current requirements with NDOR โ€” Motor Carrier Services, Permit Section.

Surveying a route through Nebraska?

RoadScope generates Nebraska-compliant survey reports automatically โ€” the right sections, certifications and documentation for NDOR โ€” Motor Carrier Services, Permit Section.

Try RoadScope Free