Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

North Carolina OS/OW Permit Requirements

United States ยท NCDOT โ€” Motor Carrier Enforcement, Oversize/Overweight Permits

Everything heavy-haul carriers need to know before moving an oversize or overweight load through North Carolina: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$12 single-trip; $100 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required
  • Weight
    Gross weight exceeds 200,000 lbs โ€” special multi-trip permit required

Fee notes

Single-trip $12 base. Annual $100. Overweight $3โ€“$240 by tier. Superload (>15 ft wide, >132,000 lbs) requires NCDOT engineering review at $250+.

Official resources

Reference information last verified May 2026. Always confirm current requirements with NCDOT โ€” Motor Carrier Enforcement, Oversize/Overweight Permits.

Surveying a route through North Carolina?

RoadScope generates North Carolina-compliant survey reports automatically โ€” the right sections, certifications and documentation for NCDOT โ€” Motor Carrier Enforcement, Oversize/Overweight Permits.

Try RoadScope Free