Montana OS/OW Permit Requirements
United States ยท MDT โ Motor Carrier Services Division
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Montana: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$10 single-trip + mileage
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 14' โ oversize permit required (Montana legal limit 14')
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 75' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 18' โ route survey required
- HeightHeight exceeds 16' โ route survey required
- WeightGross weight exceeds 200,000 lbs โ special heavy haul permit required
Fee notes
Single-trip $10 base + mileage ($0.04โ$0.15/mile by weight). Annual $40 base. Superload engineering at $75/hr MDT rate.
Official resources
- Official permit portal
- Official fee schedule
- MDT Motor Carrier Services โ Permits
- Montana OS/OW Regulations
- Montana Permit Application
Reference information last verified May 2026. Always confirm current requirements with MDT โ Motor Carrier Services Division.