All jurisdictions
Mississippi OS/OW Permit Requirements
United States ยท MDOT โ Motor Carrier Permits, State Weight Station
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Mississippi: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$10 single-trip + mileage
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 16' โ route survey required
- HeightHeight exceeds 15' โ route survey required
Fee notes
Single-trip $10 base + $0.05/mile overweight. Annual $250. Superload engineering review at MDOT hourly rate (~$100/hr).
Official resources
- Official permit portal
- Official fee schedule
- MDOT Express Pass Permit System
- Mississippi OS/OW Regulations
- Mississippi Permit Application
Reference information last verified May 2026. Always confirm current requirements with MDOT โ Motor Carrier Permits, State Weight Station.
Surveying a route through Mississippi?
RoadScope generates Mississippi-compliant survey reports automatically โ the right sections, certifications and documentation for MDOT โ Motor Carrier Permits, State Weight Station.
Try RoadScope Free