All jurisdictions
Missouri OS/OW Permit Requirements
United States ยท MoDOT โ Motor Carrier Services, Permit Unit
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Missouri: survey triggers, fees, lead times and the official permit portal.
Lead time
3 business days
Base fee
$15 single-trip; $100 annual
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 18' โ route survey required
- HeightHeight exceeds 15' โ route survey required
- WeightGross weight exceeds 200,000 lbs โ MoDOT special heavy haul analysis required
Fee notes
Single-trip $15. Annual $100. Overweight $10โ$300 by tier. Superload (>16 ft wide, >160,000 lbs) requires MoDOT Bridge analysis at $250+.
Official resources
- Official permit portal
- Official fee schedule
- MoDOT OS/OW Permits
- Missouri OS/OW Regulations
- Missouri Permit Application
Reference information last verified May 2026. Always confirm current requirements with MoDOT โ Motor Carrier Services, Permit Unit.
Surveying a route through Missouri?
RoadScope generates Missouri-compliant survey reports automatically โ the right sections, certifications and documentation for MoDOT โ Motor Carrier Services, Permit Unit.
Try RoadScope Free