Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Minnesota OS/OW Permit Requirements

United States ยท MnDOT โ€” Office of Freight & Commercial Vehicle Operations

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Minnesota: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
$15 single-trip; $300 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 75' โ€” permit required (Minnesota allows up to 75' without permit)
  • Length
    Length exceeds 175' โ€” SUPERLOAD route survey required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” route survey required
  • Height
    Height exceeds 15'6" โ€” route survey required

Fee notes

Single-trip $15 base. Annual $300. SUPERLOAD permits (>175 ft long, >200,000 lbs) coordinated through MnDOT Bridge Office โ€” engineering review $500โ€“$3,000.

Official resources

Reference information last verified May 2026. Always confirm current requirements with MnDOT โ€” Office of Freight & Commercial Vehicle Operations.

Surveying a route through Minnesota?

RoadScope generates Minnesota-compliant survey reports automatically โ€” the right sections, certifications and documentation for MnDOT โ€” Office of Freight & Commercial Vehicle Operations.

Try RoadScope Free