Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Michigan OS/OW Permit Requirements

United States ยท MDOT โ€” Office of Freight and Commercial Vehicle Operations

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Michigan: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$50 single-trip; $100 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” permit required
  • Width
    Width exceeds 8'6" โ€” permit required
  • Length
    Length exceeds 65' โ€” permit required
  • Weight
    Gross weight exceeds 164,000 lbs โ€” superheavy permit & Form 2465 required
  • Width
    Width exceeds 12' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required

Fee notes

Single-trip $50. Annual $100. Superheavy permits (Form 2465, >164,000 lbs GVW) require bridge analysis โ€” typically $1,500โ€“$5,000 plus per-bridge engineering. Escorts billed separately.

Official resources

Reference information last verified May 2026. Always confirm current requirements with MDOT โ€” Office of Freight and Commercial Vehicle Operations.

Surveying a route through Michigan?

RoadScope generates Michigan-compliant survey reports automatically โ€” the right sections, certifications and documentation for MDOT โ€” Office of Freight and Commercial Vehicle Operations.

Try RoadScope Free