Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Maine OS/OW Permit Requirements

United States ยท MaineDOT โ€” Motor Carrier Division, Permit Office

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Maine: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
$30 single-trip; $300 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 14' โ€” route survey required
  • Height
    Height exceeds 14' โ€” route survey required

Fee notes

Single-trip $30. Annual $300. Overweight $5 per 1,000 lbs above 100,000. Superload bridge analysis billed at MaineDOT hourly rate.

Official resources

Reference information last verified May 2026. Always confirm current requirements with MaineDOT โ€” Motor Carrier Division, Permit Office.

Surveying a route through Maine?

RoadScope generates Maine-compliant survey reports automatically โ€” the right sections, certifications and documentation for MaineDOT โ€” Motor Carrier Division, Permit Office.

Try RoadScope Free