All jurisdictions
Maine OS/OW Permit Requirements
United States ยท MaineDOT โ Motor Carrier Division, Permit Office
Everything heavy-haul carriers need to know before moving an oversize or overweight load through Maine: survey triggers, fees, lead times and the official permit portal.
Lead time
5 business days
Base fee
$30 single-trip; $300 annual
Permit validity
Up to 5 days
Route survey triggers
- HeightHeight exceeds 13'6" โ oversize permit required
- WidthWidth exceeds 8'6" โ oversize permit required
- LengthLength exceeds 65' โ oversize permit required
- WeightGross weight exceeds 80,000 lbs โ overweight permit required
- WidthWidth exceeds 14' โ route survey required
- HeightHeight exceeds 14' โ route survey required
Fee notes
Single-trip $30. Annual $300. Overweight $5 per 1,000 lbs above 100,000. Superload bridge analysis billed at MaineDOT hourly rate.
Official resources
- Official permit portal
- Official fee schedule
- Maine BMV Overlimit Permits
- Maine Motor Carrier Services
- Maine Permit Application
Reference information last verified May 2026. Always confirm current requirements with MaineDOT โ Motor Carrier Division, Permit Office.
Surveying a route through Maine?
RoadScope generates Maine-compliant survey reports automatically โ the right sections, certifications and documentation for MaineDOT โ Motor Carrier Division, Permit Office.
Try RoadScope Free