Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Maryland OS/OW Permit Requirements

United States ยท MDOT SHA โ€” Office of Traffic & Safety, Commercial Vehicle Enforcement

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Maryland: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
$30 single-trip; $360 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 14' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required

Fee notes

Single-trip $30. Annual $360. Overweight $20โ€“$300 by class. Superload (>16 ft wide, >150,000 lbs) requires SHA engineering review at $250โ€“$2,000.

Official resources

Reference information last verified May 2026. Always confirm current requirements with MDOT SHA โ€” Office of Traffic & Safety, Commercial Vehicle Enforcement.

Surveying a route through Maryland?

RoadScope generates Maryland-compliant survey reports automatically โ€” the right sections, certifications and documentation for MDOT SHA โ€” Office of Traffic & Safety, Commercial Vehicle Enforcement.

Try RoadScope Free