Georgia OS/OW Permit Requirements

United States ยท GDOT โ€” Office of Permits, Motor Carrier Compliance Division

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Georgia: survey triggers, fees, lead times and the official permit portal.

Lead time
3 business days
Base fee
$30 single-trip OS/OW permit
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 13'6" โ€” oversize permit required
  • Width
    Width exceeds 8'6" โ€” oversize permit required
  • Length
    Length exceeds 65' โ€” oversize permit required
  • Weight
    Gross weight exceeds 80,000 lbs โ€” overweight permit required
  • Width
    Width exceeds 16' โ€” route survey required
  • Height
    Height exceeds 15' โ€” route survey required

Fee notes

Flat $30 per single-trip permit. Annual $150. Superload (>16 ft wide, >180,000 lbs) priced via route survey at $500+ with engineering analysis.

Official resources

Reference information last verified May 2026. Always confirm current requirements with GDOT โ€” Office of Permits, Motor Carrier Compliance Division.

Surveying a route through Georgia?

RoadScope generates Georgia-compliant survey reports automatically โ€” the right sections, certifications and documentation for GDOT โ€” Office of Permits, Motor Carrier Compliance Division.

Try RoadScope Free