Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Yukon OS/OW Permit Requirements

Canada ยท Yukon Highways and Public Works โ€” Motor Vehicles Branch, OS/OW Permits

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Yukon: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
C$50 single-trip OS/OW permit
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 4.15 m (13.6 ft) โ€” special permit required
  • Width
    Width exceeds 2.6 m (8.5 ft) โ€” special permit required
  • Length
    Length exceeds 23.0 m (75.5 ft) โ€” special permit required
  • Weight
    GVW exceeds 63,500 kg (140,000 lbs) โ€” overweight permit required
  • Width
    Width exceeds 5.0 m (16.4 ft) โ€” route survey required

Fee notes

Single-trip C$50 base. Annual C$200. Long lead time for superloads on Alaska Highway corridor. Engineering review via Yukon Highways & Public Works at cost.

Official resources

Reference information last verified May 2026. Always confirm current requirements with Yukon Highways and Public Works โ€” Motor Vehicles Branch, OS/OW Permits.

Surveying a route through Yukon?

RoadScope generates Yukon-compliant survey reports automatically โ€” the right sections, certifications and documentation for Yukon Highways and Public Works โ€” Motor Vehicles Branch, OS/OW Permits.

Try RoadScope Free