Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

British Columbia OS/OW Permit Requirements

Canada ยท BC Ministry of Transportation โ€” Commercial Transport

Everything heavy-haul carriers need to know before moving an oversize or overweight load through British Columbia: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
C$25 single-trip; C$350 annual
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 4.15 m (13.6 ft) โ€” special permit required
  • Width
    Width exceeds 2.6 m (8.5 ft) โ€” special permit required
  • Length
    Length exceeds 23.0 m (75.5 ft) โ€” special permit required
  • Weight
    GVW exceeds 63,500 kg (140,000 lbs) โ€” overweight permit required
  • Width
    Width exceeds 4.88 m (16.0 ft) โ€” route survey required
  • Height
    Height exceeds 5.0 m (16.4 ft) โ€” route survey required
  • Weight
    GVW exceeds 140,000 kg (308,650 lbs) โ€” engineering bridge analysis required

Fee notes

Single-trip C$25 base. Annual C$350. Overweight surcharge C$10โ€“C$250 by tier. Engineering review for superloads (>140,000 kg / 308,650 lbs) at C$500โ€“C$3,000 via Commercial Vehicle Safety & Enforcement.

Official resources

Reference information last verified May 2026. Always confirm current requirements with BC Ministry of Transportation โ€” Commercial Transport.

Surveying a route through British Columbia?

RoadScope generates British Columbia-compliant survey reports automatically โ€” the right sections, certifications and documentation for BC Ministry of Transportation โ€” Commercial Transport.

Try RoadScope Free