Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Prince Edward Island OS/OW Permit Requirements

Canada ยท PEI Department of Transportation and Infrastructure โ€” Oversize/Overweight Permits

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Prince Edward Island: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
C$30 single-trip OS/OW permit
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 4.15 m (13.6 ft) โ€” special permit required
  • Width
    Width exceeds 2.6 m (8.5 ft) โ€” special permit required
  • Length
    Length exceeds 23.0 m (75.5 ft) โ€” special permit required
  • Weight
    GVW exceeds 63,500 kg (140,000 lbs) โ€” overweight permit required
  • Width
    Width exceeds 4.88 m (16.0 ft) โ€” route survey required

Fee notes

Single-trip C$30 base. Annual C$120. Confederation Bridge has separate posted tolls + clearance restrictions billed separately by Strait Crossing.

Official resources

Reference information last verified May 2026. Always confirm current requirements with PEI Department of Transportation and Infrastructure โ€” Oversize/Overweight Permits.

Surveying a route through Prince Edward Island?

RoadScope generates Prince Edward Island-compliant survey reports automatically โ€” the right sections, certifications and documentation for PEI Department of Transportation and Infrastructure โ€” Oversize/Overweight Permits.

Try RoadScope Free