Join us at Breakbulk AmericasSept 22โ€“23, 2026Houston, TX ยท Booth M01
All jurisdictions

Ontario OS/OW Permit Requirements

Canada ยท Ontario MTO โ€” Carrier Services and Enforcement Branch

Everything heavy-haul carriers need to know before moving an oversize or overweight load through Ontario: survey triggers, fees, lead times and the official permit portal.

Lead time
5 business days
Base fee
C$120 single-trip; C$500 annual (oversize)
Permit validity
Up to 5 days

Route survey triggers

  • Height
    Height exceeds 4.15 m (13.6 ft) โ€” permit required
  • Width
    Width exceeds 2.6 m (8.5 ft) โ€” permit required
  • Length
    Length exceeds 23.0 m (75.5 ft) โ€” permit required
  • Weight
    GVW exceeds 63,500 kg (140,000 lbs) โ€” overweight permit required
  • Width
    Width exceeds 5.0 m (16.4 ft) โ€” Annual Oversize route survey required
  • Height
    Height exceeds 5.0 m (16.4 ft) โ€” route survey required
  • Weight
    GVW exceeds 140,000 kg (308,650 lbs) โ€” OSOW Level 3 engineering review

Fee notes

Single-trip C$120; Annual Oversize Permit C$500. Annual Overweight C$1,000+ by axle config. Engineering reviews for superloads (>5 m wide, >63,500 kg) start at C$1,000โ€“C$5,000 via MTO Bridge Office.

Surveying a route through Ontario?

RoadScope generates Ontario-compliant survey reports automatically โ€” the right sections, certifications and documentation for Ontario MTO โ€” Carrier Services and Enforcement Branch.

Try RoadScope Free