The Bridge Analysis Workflow
When preparing permit documentation that involves bridges, RoadScope provides a structured workflow for cross-referencing your field measurements with the documented bridge inventory.
Step 1: Auto-Population
When you create a route, documented bridges are automatically added as POIs. Review the auto-populated bridges against your field survey — confirm that all physical bridges on the route are represented.
Step 2: Field Measurement Reconciliation
For each bridge POI, compare the documented clearance value against your field measurement:
- **Match** — Your measurement confirms the documented value. Note this explicitly in the POI.
- **Field lower** — Your measurement is more restrictive. Use your field value for load analysis — it is the current condition.
- **Documented lower** — The documented value is more restrictive. Investigate — the bridge may have been raised, or the record may be outdated.
Step 3: Load Analysis
With field measurements reconciled, run the load analysis against your load envelope. RoadScope flags any bridge where the clearance or weight rating may be insufficient for the proposed move.
Step 4: Documentation
The Full Report includes a bridge summary table with the inventory record number, field measurement, reconciliation status, and any notes. This is the format most permit offices require.
Weight Rating Documentation
For heavy loads that approach weight limits, document the Operating and Inventory ratings alongside any engineering letters or special permits obtained for the route.